Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools

Authors

DOI:

https://doi.org/10.26439/ing.ind2020.n039.4915

Keywords:

lean manufacturing, lead time, productivity

Abstract

The present work aims to improve the lead time and productivity in the pizza assembly process of a medium-sized company. To this end, lean manufacturing tools were used for implementing a work method that eliminates wastes or activities that add no value to the process. The results showed a reduction in the process lead time by 99% and an increase in the productivity of up to 20% compared to the initial situation. It was concluded that the tools used in the research, such as the line balancing graph, 5S or cellular manufacturing, allowed the elimination of wastes found during the process.

Downloads

Download data is not yet available.

References

Bicheno, J. y Holweg, M. (2009). The Lean Toolbox the Essential Guide to Lean Transformartion [La caja de herramientas esbelta: la guía esencial para la transformación esbelta] [fourth edition]. United Kingdom: PICSIE Books.

Cámara de Comercio de Lima (10 de diciembre del 2018). Urge aumentar la competitividad de mypes. La cámara. Recuperado de https://www.camaralima.org.pe/repositorioaps/0/0/par/r857_3/eventos%202.pdf

Cooper, R y Maskell, B. (2008) How to manage through worse-before better [Cómo gestionar lo peor antes que lo mejor]. MIT Sloan Management Review, 49(4), 58-65.

Imai, M. (1998). Cómo implementar el kaizen en el sitio de trabajo (gemba) [traducido de la primera edición]. Colombia: McGraw-Hill Interamericana S.A.

Martínez, P.; Martínez, J.; Nuño, P. y Cavazos, J. (2015). Mejora en el tiempo de atención al paciente en una unidad de urgencias mediante la aplicación de manufactura esbelta. Revista Información tecnológica, 26(6), 187-198. Recuperado de https://scielo.conicyt.cl/scielo.php?script=sci_arttext&pid=S0718-07642015000600019

Monge, C.; Cruz, J. y López, F. (2013). Impacto de la manufactura esbelta, manufactura sustentable y mejora continua en la eficiencia operacional y responsabilidad ambiental en México. Revista Información tecnológica, 24(4), 15-32. Recuperado de https://scielo.conicyt.cl/scielo.php?script=sci_arttext&pid=S0718-07642013000400003

Niebel, B. y Freivalds, A. (1990). Ingeniería Industrial. Métodos, tiempos y movimientos [tercera edición]. México: Alfaomega.

Rajadell, Carreras, M. y Sánchez García, J. L. (2010). Lean Manufacturing, la evidencia de una necesidad. España: Díaz de Santos.

Ríos, E. (2018). Aplicación de lean manufacturing para aumentar la productividad de la línea de producción de calzado de seguridad GYW de la empresa SEGUSA SAC [tesis de grado, Universidad Nacional de Trujillo, Perú]. Repositorio institucional de la Universidad Nacional de Trujillo. Recuperado de http://dspace.unitru.edu.pe/bitstream/handle/UNITRU/11131/RIOS%20BERNUY%2c%20Edinson%20Eloy.pdf?sequence=1&isAllowed=y

Rother, M. y Shook, J. (1999). Observar para crear valor. Cartografía de la cadena de valor para agregar valor y eliminar “muda” (versión 1.2). USA: The Lean Enterprise Institute.

Salazar, M. (2017). Mejora en la productividad durante la fabricación de cabina cerrada implementando lean manufacturing en una empresa privada metalmecánica [tesis de grado, Universidad San Ignacio de Loyola, Perú]. Repositorio institucional de la Universidad San Ignacio de Loyola. Recuperado de http://repositorio.usil.edu.pe/bitstream/USIL/3212/1/2018_Salazar-Bozzeta.pdf

Secretaría Central de ISO (2015). Norma Internacional ISO 9001, traducción oficial. Sistemas de gestión de la calidad - Requisitos [quinta edición]. Suiza: Autor.

Socconini, L. (2017). Lean manufacturing paso a paso [primera edición]. México: Pandora.

Tapping, D. y Shuker, T. (2003). Value Stream Management for the Lean Office. Eight steps to planning, Mapping, and Sustaining Lean Improvements in Administrative areas. [Gestión de flujo de valor para la oficina esbelta. Ocho pasos para la planificación, mapeo y mantenimiento de mejoras esbeltas en áreas administrativas]. USA: Productivity Press.

Womack, J.; Jones, D. y Roos, D. (1990). The machine that changed the world: The story of lean production [La máquina que cambió al mundo: la historia de la producción esbelta] [primera edición]. New York: Rawson Associates.

Downloads

Published

2020-12-01

Issue

Section

Production management

How to Cite

Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools. (2020). Ingeniería Industrial, 39(039), 51-72. https://doi.org/10.26439/ing.ind2020.n039.4915