Reduction of material handling in an automobile assembly line through lean manufacturing

Authors

DOI:

https://doi.org/10.26439/ing.ind2021.n40.4880

Keywords:

lean manufacturing, line stoppages, operating costs, material handling, lean tools

Abstract

This article focuses on the application of lean manufacturing principles to an automobile assembly plant, which had production line stoppages and long runs that generated losses caused by failure to deliver the units on time to dealers. In the end, line stoppages were reduced by up to 50% that generated savings of $383,751.

Downloads

Download data is not yet available.

References

Acevedo Suárez, J. A., Urquiaga Rodríguez, A. J., y Gómez Acosta, M. (2001). Gestión de la cadena de suministro. La Habana: Centro de Estudio Tecnología de Avanzada (CETA) y Laboratorio de Logística y Gestión de la Producción (Logespro).

Anderson, D., y Bozheva, T. (2019). Kanban maturity model: desarrollando la agilidad organizativa y de negocio en empresas industriales. DYNA Management, 7(1). http://dx.doi.org/10.6036/MN8805

Arango Serna, M. D., Campuzano Zapata, L. F., y Zapata Cortes, J. A. (2015). Mejoramiento de procesos de manufactura utilizando Kanban. Revista Ingenierías Universidad de Medellín, 14(27), 221-233.

Bravo, J. J., Orejuela, J. P., y Menduiña, Z. (2012). Aproximación a la medición del impacto del backorder en sistemas de manufactura flexible. Revista Facultad de Ingeniería Universidad de Antioquia, 65, 99-111.

Chase, R. B., Jacobs, F. R., y Aquilano, N. J. (2009). Administración de operaciones. Producción y cadena de suministros. México D. F.: McGraw-Hill.

Figueredo Lugo, F. J. (2015). Aplicación de la filosofía lean manufacturing en un proceso de producción de concreto. Ingeniería Industrial. Actualidad y Nuevas Tendencias, 4(15), 7-24.

Franco, J. M., Jimenez-García, J. A., y Ruelas-Santoyo, E. A. (2019). Minimization of thetime for the materials supply through a mixed integer linear programming model. Dyna Management, 7(1). doi: http://dx.doi.org/10.6036/MN9037

Jiménez-García, J. A., Mendiola-García, J. Y., Medina-Flores, J. M., Mezura-Montes, E., y Vázquez-López, J. A. (2016). Reducing losses due to lack of supply in a manufacturing company using a mixed-integer linear programming model. International Journal of Combinatorial Optimization Problems and Informatics, 7(2), 3-12.

Lijalem, M. (2020). Productivity improvement through lean manufacturing tools in Ethiopian garment manufacturing company. Materials Today: Proceedings, 37(2), 1432-1436. https://doi.org/10.1016/j.matpr.2020.06.599

Martínez Sánchez, P., Martínez Flores, J., Nuño de la Parra, P., y Cavazos Arroyo, J. (2016). Mejora en el tiempo de atención al paciente en una unidad de urgencias ginecoobstétricas mediante la aplicación de lean manufacturing. Revista Lasallista de Investigación, 13(2), 46-56.

Oropesa-Vento, M., García-Alcaraz, J. L., Rivera, L., y Manotas, D. F. (2015). Effects of management commitment and organization of work teams on the benefits of Kaizen: Planning stage. Dyna, 82(191), 76-84.

Rodenes Adam, M., Moncaleano Rodríguez, G. I., y Martínez Aparisi, A. (2009). Importancia del outsourcing como apoyo de los servicios a la industria. Economía Industrial, 374, 65-73.

Rodríguez León, J., Quiroga Méndez, J. E., y Ortiz Pimiento, N. R. (2013). Performance comparison between a classic particle swarm optimization and a genetic algorithm in manufacturing cell design. Dyna, 80(178), 29-36.

Vargas-Hernández, J. G., Jiménez Castillo, M. T., y Muratalla-Bautista, G. (2018). Sistemas de producción competitivos mediante la implementación de la herramienta lean manufacturing. Ciencias Administrativas, 6(11), 81-95. https://doi.org/10.24215/23143738e020

Downloads

Published

2021-06-08

Issue

Section

Production management

How to Cite

Reduction of material handling in an automobile assembly line through lean manufacturing. (2021). Ingeniería Industrial, 40(40), 49-60. https://doi.org/10.26439/ing.ind2021.n40.4880