[1]
2024. Improved Supply Management, Production Planning and Control Through Material Requirements Planning and Master Production Schedule Tools in a Mype Dark Kitchen. Ingeniería Industrial. 46 (Jun. 2024), 83–103. DOI:https://doi.org/10.26439/ing.ind2024.n046.6875.